GAP, INC – OLD NAVY DISTRIBUTION CENTER
Taitem provided measurement and verification for an energy retrofit at this 2 million SF warehouse.The Technical Review project was to confirm the retrofit of lighting and occupancy sensors at the distribution center and NDC at their Fishkill facility, a total of 1.5 million SF. Our work included a site visit, data collection, analysis and a report. Measured and verified energy savings of 3,923,324 kWh or an incentive of $470,799.
YEAR 2018
SIZE 1.5 million SF